Turn-Key Process
Preferred China Manufacturing Resources for all Industries!
The phrase “Turn-key” was applied originally to automobile deliveries. The idea
is that you simply accept the delivery and turn the key, hence the phrase “Turn
Key”. At E.E. URD Design and Manufacturing we’re not building automobiles
directly, but we can apply the Turn-key philosophy to your product design and manufacturing
project as well. The following is a brief outline, in very simple terms, of the process
from start to finish. Please note that we work with clients at all stages of
development and will gladly perform what is required on a case-by-case basis.
Project Evaluation and Design Process
Simply this is the beginning of any project following your concept. We may receive firm
engineering designs complete with the BOM (bill of materials), drawings, and
CAD/3D files, to allow an explicit calculation of the costs involved to tool and
manufacturer your product and/or assembly. Other times we may receive a partial
design, with or without a prototype, or a prototype only, or even just the
concept scribbled in summary form. The more detail we can receive the easier our
job and the less your startup cost. Whatever the case may be we will work with
your company at a professional level to bring your concept to production-ready
status in the shortest time possible. All design work is done by contract and
all NRE (non-recurring engineering fees) are calculated upfront.
Tooling Concept Outline
Once the design is firm we must embark upon the
tooling process. Tooling is a general term that is used loosely to refer to all
the machinery, moulds, and fixtures that must be set up and built to mass
produce your product. These tools can be mould cavities as in the case of the
injection mold tooling
process, dies for cutting patterns, bending tools to produce complex shapes,
investment casting, or any other process required to prepare for continuous mass
production. At this stage (and all stages) it is also important to consider your
forecast and EAU (estimated annual usage). A determination of this is often
required as it helps us decide how complex our tooling layout needs to be. For
example will you require a single-cavity moulds verse multi-cavity and/or family
moulds? Are you planning to produce thousands or hundreds of thousands or
millions of pieces per year? We discuss the details with each client personally
to be sure we are preparing our production fixtures properly to meet your annual
requirements.
Sampling and Adjustments

Immediately following the
tooling
process is when the first sample articles are normally produced. Not until
we can receive a formal approval for this sample(s) is mass production
initiated. Making the transition from design to tooling to samples is not always
a straight forward process and usually requires some “tweaking”. Having a
physical sample available and being able to feel and work with something will
often allow for the realization of required changes. Since your
relationship with E.E.URD is factory direct we can often produce standard
tooling and adjust as necessary for less than it would cost to pursue the
prototype process in the US. Rest assured we will work with you diligently to be
sure every requirement is met to your satisfaction. We will do our very best to
help you decide the most cost-effective solution to meet your production needs.
Production
Subsequent to formal approval, we are free to begin with your ordered
production. There is no standard time frame that can be applied to all product
manufacturing every project is different. For example, for smaller plastics runs
you can expect the first lot to be out the door within two weeks. We have worked
with clients that have tight schedules and will certainly do our absolute best
to meet your requirements, adding additional production shifts if necessary. All
estimated production times will be discussed and explained before proceeding.
Packaging
We may either reproduce your intended packaging format or help design one on our
own if needed. It is extremely helpful if our clients can submit their required
artwork; formats such as Illustrator, Corel, PageMaker, and Freehand are
acceptable. We will produce a counter drawing for your approval before a first
article is produced. Also important here are topics such as box type, paper
type, surface type or coating, required sealing, instructions and/or manuals,
shrink wrapping, inner and outer cartons, shipping boxes, shipping marks, and so
forth.
Shipping
At E.E.URD Design and Manufacturing we work with some of the best and most
efficient shipping companies in the business to deliver your products to any
port, warehouse, or front door in the world. In addition we can offer services
such as stocking of parts, and independent trucking services for any other
reason whatsoever. Clients have several options when booking transit, depending
of course upon the desired time frame of arrival.

Air shipments, while more costly can arrive at
domestic airports and be delivered within 2 weeks of shipment. Sea freights are
less costly but will often require 4-5 weeks door-to-door for domestic
addresses. Depending upon the time of year and chosen method of shipment transit
times may vary. In addition we will handle all the required paperwork necessary
for US and/or foreign customs; our customers simply need to advise us the
address and contact information to use our shipping services.
Billing
In general our billing structure is as follows:
- Design: Quoted per case and often can be waived if only minor assistance is
required. 50% is requested with the contract and the balance is due upon
completion.
- Tooling: 50% is required with the order and the balance is due upon approval of
tooled samples.
- Production: This is open to negotiation; however, for new accounts production
payment may be required in advance of shipping. Established clients may be
granted extended payment terms.
- Shipping: All prices quoted for production are EXW (from factory) origin. If
elected to use our shipping services, billing is normally done separately
approximately 2-3 weeks post delivery and is due upon receipt of our invoice.
Certain restrictions may apply for certain commodities. Shipping prices
fluctuate with the industry and holidays and are subject to change. E.E. URD
imposes NO added margin on freight charges; it is a courtesy for our clients.
Please feel free to contact us with
any questions or comments related to services provided by E.E. URD Design and
Manufacturing, Inc.